FREE TECHNICAL DOWNLOAD // 14-POINT SPECIFICATION

SCORE YOUR PROJECT AGAINST
ALL 14 CMM POINTS

Identify the critical disconnect between paper schedules and jobsite reality before claims, delays, and budget overruns compound. Engineered from 40 years of independent forensic construction auditing.

  • Detect intentional schedule float manipulation up to 6 months before pay apps
  • Audit actual field alignment across all 6 project stakeholder entities
  • Verify true on-site physical progress against claimed completion percentages
  • Establish bulletproof forensic documentation for immediate owner protection
DIRECT PDF TRANSMISSION · NO MARKETING DRIP · STRICT TECHNICAL CONFIDENTIALITY
SPEC: CMM-14 HEALTH MATRIX
AUDIT FORM // V4.2
CMM
# AUDIT POINT / CRITICAL CONTROL 1 2 3 4 5
01 Owner / GC Contract Good-Faith Alignment - - - -
02 Schedule Float & Milestone Reality Verification - - - -
03 Pay App Stored Materials vs. Site Inspection - - - -
04 6-Entity Jobsite Objective Gap Analysis - - - -
05 Subcontractor Buyout vs. Allowance Float - - - -
06 Forensic RFI Turnaround & Escalation Trail - - - -
07 Disputed Work / Unilateral Change Orders - - - -

OPERATOR CREDIBILITY & FIELD PROOF

BUILT FROM 40 YEARS
OF FIELD TRUTH

"I have spent forty years on jobsites spanning municipal utilities, commercial structures, and billion-dollar public works. The pattern is always identical: projects rarely collapse because the contract was weak. They collapse in the deliberate gap between 'paper truth'—the pristine Gantt charts and progress billing statements—and 'field truth.' Standard project management fatally assumes every stakeholder acts in mutual good faith. When six independent entities have conflicting financial incentives, paper reports hide schedule rot until it is six months too late to recover. This framework is not a lead magnet; it is the exact diagnostic audit I use as an independent construction auditor to expose bad-faith management before cost overruns become irreversible."

GUY JAVARONE
Independent Construction Auditor & Owner's Representative • Critical Management Methods

OPERATING SPECIFICATIONS

40

YEARS IN FIELD • COMMERCIAL TO $1B+ PUBLIC WORKS

14

AUDIT POINTS • SYSTEMATIC HEALTH DIAGNOSTIC

15

MINUTES TO SCORE • IMMEDIATE FIELD TRUTH EXPOSURE